Blower Door Verification

Measured building performance

Air Tightness Testing Blower Door Verification for Residential Projects

Tacoma Energy provides air tightness testing to measure enclosure performance, document compliance, and help builders identify air-leakage concerns before project closeout. Testing results are coordinated with applicable energy-code, certification, program, and project requirements.

01

Measured Performance

Blower door testing provides a measurable result for whole-building air leakage rather than relying on visual assumptions alone.

02

Compliance Documentation

Results can support energy-code compliance, ERI programs, certifications, builder standards, and final project documentation.

03

Construction Quality

Testing helps identify whether enclosure performance aligns with the project target and whether corrective work may be needed.

One measured result. Clear project documentation. Air tightness testing converts enclosure performance into a verified value that can be used for compliance, quality assurance, and project closeout.
Understanding the test

How Blower Door Testing Measures Air Leakage

A calibrated fan creates a controlled pressure difference across the building enclosure. The resulting measurement shows how much air moves through unintended openings in the home.

Animated diagram showing how a blower door test measures air leakage through a home

Blower Door Testing

The calibrated fan changes the pressure inside the home so air movement through the enclosure can be measured using standardized testing equipment.

House diagram identifying common air-leakage pathways through the building enclosure

Common Air-Leakage Pathways

Leakage can occur through connections and penetrations at walls, ceilings, floors, windows, doors, attic access points, plumbing, electrical components, and mechanical systems.

Testing Applications

Testing scope and timing are coordinated around the project’s construction stage and compliance requirements.

Final blower door testing Whole-building air leakage verification for code, certification, or builder-performance requirements.
Diagnostic testing Testing performed to help identify unexpected enclosure leakage or performance concerns.
Retesting and verification Follow-up testing after corrective work when required by the project scope.

Coordinated Testing Process

Tacoma Energy coordinates scheduling, field testing, measured results, and documentation through one accountable workflow.

01
Project requirements confirmed Testing targets, construction status, and documentation needs are reviewed before the site visit.
02
Field testing completed The enclosure is tested using calibrated blower door equipment and standardized procedures.
03
Results documented Measured performance and applicable project records are prepared for the builder and compliance team.
Scroll to Top